Vertac Height Services were engaged to carry out a full-scale façade inspection and subsequent remediation programme for the Cider Building. By using specialised software, our team accurately recorded locations and quantities of existing defects which enabled accurate cost projection for the client. The remedial project itself was then seamlessly executed by our team in a timely manner.

Site

4 Williamson Avenue, Auckland

Client

Oyster

Services

  • Detailed facade inspection
  • Crack injection
  • Concrete repairs
  • Sealant replacement

Approach: Our approach combined precision, efficiency, and safety to deliver a high-quality outcome for the client. The project began with a comprehensive façade inspection using rope access and advanced digital reporting software, allowing us to map and quantify defects with accuracy. This data-driven process ensured transparency and provided the client with reliable cost projections.
Once the remediation programme commenced, works were carefully sequenced to minimise disruption to building operations and occupants. Our skilled technicians employed industry best practices and quality-controlled techniques to carry out crack injection, sealant replacement, and concrete repairs. Throughout the process, strict adherence to safety protocols and continuous communication with the client ensured smooth project delivery and exceptional results.

Methodology: The remedial programme involved targeted façade works, including:
• Crack injection approx. 65 lm
• Replacing sealant (approx. 150 lm)
• Concrete remediation (approx. 4 locations)